This website is best viewed in a browser that supports web standards.
Skip to content or, if you would rather, Skip to navigation.
March 31, 2024St. Joseph, Mo. | By: Jeremy Werner
St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of April 1-7. Inclement weather may cause schedule changes in some of the planned work. There also may be moving operations throughout the region, in addition to the work mentioned below. MoDOT asks drivers to work with us by buckling up, putting your phone down, slowing down and moving over in work zones. Andrew County U.S. Route 59 – Resurfacing project from Business U.S. 71 to Country Club Road through mid-April (Contractor: Herzog Contracting Corp.). Route D – CLOSED for slide repairs from County Road 185 to County Road 223, April 2-3, 7 a.m. to 4 p.m. Route O – Permit/utility work east of County Road 295, April 1-April 12. Interstate 229 – Bridge maintenance at the bridge over Dillon Creek, April 1-5. U.S. Route 71 – Resurfacing project from the intersection of Route T near Savannah to the intersection of Business Route 71 near Maryville through mid-October (Contractor: Herzog Contracting Corp.). Atchison County Route 46 – CLOSED for a bridge replacement project at the Little Tarkio Creek east of Fairfax, through May 2024. (Contractor: North Central Bridge, LLC) https://www.modot.org/missouri-route-111-missouri-route-46-and-route-yy-bridge-replacement-atchison-and-gentry. U.S. Route 136 – Bridge washing at the Brownville Bridge, April 6. The bridge will be narrowed to one lane (Contractor: AAD Contracting, Inc.). Buchanan County U.S. Route 169 – Resurfacing project from Route FF in Buchanan County to the Clinton/Clay County line through August 2024 (Contractor: Emery Sapp & Sons). Route 752 – Resurfacing project from 22nd Street to U.S. Route 59 through mid-April (Contractor: Herzog Contracting Corp.). Route 752 – RAMP CLOSED from Route 371 (22nd Street) to westbound Route 752 (Mason Road) for a resurfacing project, April 1, 6 a.m. to 7 p.m. Route AC – Intersection and ADA improvements at Messanie Street through mid-May (Contractor: Herzog Contracting Corp.). Caldwell County Route 13 – CLOSED from Far West Drive to Kingston for a resurfacing project from the south city limits of Hamilton to just north of Route HH in Kingston through mid-June. (Contractor: Phillips Hardy, Inc.) https://www.modot.org/13-pavement-resurfacing-caldwell-and-daviess. Chariton County Route 11 – Pothole patching from Route E to U.S. Route 24, April 1-5. Route C – CLOSED for a culvert replacement from Route 5 to Hurricane Branch Avenue, April 1-4, 8 a.m. to 3 p.m. daily. Route C – CLOSED for a culvert replacement from Hurricane Branch Avenue to Saint Joseph Avenue, April 2, 8 a.m. to 3 p.m. Route C – CLOSED for a culvert replacement from Saint Joseph Avenue to Siloam Avenue, April 3-5, 8 a.m. to 3 p.m. daily. Clinton County Route H – CLOSED for a bridge replacement project from NE Estep Road to U.S. Route 69 through November 2024. (Contractor: Phillips Hardy, Inc.) https://www.modot.org/route-h-bridge-replacement-clinton. U.S. Route 169 – Resurfacing project from the Clinton/Clay County line to Route FF in Buchanan County through August 2024 (Contractor: Emery Sapp & Sons).
Daviess County Route BB – Bridge maintenance at the bridge over I-35, April 1-5. The bridge will be narrowed to one lane around-the-clock with temporary traffic signals in place to guide motorists through the work zone. DeKalb County Route E – CLOSED daily in 2-mile sections for a resurfacing project from Route A to U.S. Route 69, April 1-8 (Herzog Contracting Corp.). Route D – CLOSED daily in 2-mile sections for a resurfacing project from Route 6 to Pleasant Road, April 1-8 (Herzog Contracting Corp.). Gentry County Route YY – CLOSED for a bridge replacement project at the Bear Creek Bridge through April 2024. (Contractor: Gene Haile Excavating, Inc.) https://www.modot.org/atchison-and-gentry-counties-bridge-replacements. Holt County U.S. Route 59 – Access to and from County Road 260 will be CLOSED for a culvert replacement, April 3, 7:30 a.m. to 3:30 p.m. Linn County U.S. Route 36 – Concrete replacement westbound from Route 11 to Helm Street, April 1-2. The road will be narrowed to one lane around the clock. U.S. Route 36 – Concrete replacement eastbound from Helm Street exit to Route 11, April 2-3. The road will be narrowed to one lane around the clock. U.S. Route 36 – Concrete replacement westbound from Route 5 to Katy Drive, April 4-5. The road will be narrowed to one lane around the clock. Route 130 – CLOSED for a culvert replacement from Export Road to Eli Road, April 1, 8 a.m. to 3 p.m. Livingston County Route D – CLOSED until further notice at the Rattlesnake Creek Bridge due to deterioration. This bridge is included for replacement in the Northwest Bridge Bundle. Construction is tentatively scheduled to begin in May 2024. https://www.modot.org/northwest-missouri-design-build-bridge-bundle.
Route D – Sidewalk improvements in Ludlow through mid-April. (Contractor: BRS Construction, LLC). https://www.modot.org/route-b-route-d-and-route-k-sidewalkada-improvements-livingston.
U.S. Route 36 – Resurfacing and pavement improvement project from the Coon Creek bridge in Chillicothe to the Caldwell County line through June. One lane may be closed in either direction around-the-clock. A 15-foot width restriction will be in place with a 10-foot width restriction under the U.S.Route 65 bridge and the Kansas City Sub railroad bridge in Chillicothe (Contractor: Magruder Paving, LLC).
Nodaway County U.S. Route 71 – Culvert maintenance from 180th Street to 190th Street, April 1. Route AB – Pothole patching from U.S. Route 71 to Route 46, April 1-5. Route DD – CLOSED for a culvert replacement from 300th Street to 310th Street, April 2, 7:30 a.m. to 3:30 p.m. Putnam County Route U – CLOSED for a culvert replacement from 110th Street to 140th Street, April 4, 8 a.m. to 1 p.m. Worth County U.S. Route 169 – Resurfacing and slide repair project from the Iowa State line to just north of Route 46 through July 2024 (Contractor: Herzog Contracting Corp.).
--- ### |